Remodel
A Kitchen That Works The Way You Cook
A kitchen touches every trade: cabinets, counters, plumbing, electrical, tile and paint. We sequence all of it so your template date, delivery date and install date line up. One crew, one schedule, one person answering your questions.

What's Included
Everything In The Scope
- Design layout and material selection support
- Cabinet installation — stock, semi-custom or custom
- Cabinet painting and refacing
- Quartz, granite and butcher block countertops
- Tile backsplash and under-cabinet lighting
- Sink, faucet, disposal and dishwasher hookup
- Flooring, trim and full repaint
Starting At
$18,000
Cabinet refresh and counters start near $18k. Full gut remodels with custom cabinetry typically run $45,000 – $90,000.
Get My Exact Price(206) 555-0142Materials We Use
- Quartz from Caesarstone, Cambria and MSI
- Shaker, slab and inset cabinet doors
- Blanco, Kraus and Kohler sinks and faucets
- Soft-close hardware from Blum and Grass
Typical timeline
3 – 6 weeks
Scope
Refresh to full gut
How It Works
From First Call To Final Walkthrough
The same four steps on every job of this type, so you always know what happens next.
Design & scope
We measure, talk through how you actually use the room, and build a fixed-scope estimate with a payment schedule.
Order & schedule
Cabinets and counters ordered early, install dates locked, demo scheduled only once material is confirmed.
Build
Demo, rough plumbing and electrical, cabinets, counter template and install, backsplash, then paint and trim.
Punch list & handover
We walk it with you, fix every item on your list, and hand over care instructions and warranty paperwork.
Free Estimate
Tell Us About
Your Project
Send the details and we will come out, measure, and put real numbers on paper. Most estimates land in your inbox within 48 hours of the visit.
- Free on-site visit and written estimate
- Itemized pricing — you see every line
- Licensed, bonded and insured in Washington
- Two-year workmanship warranty
Kitchen Remodel FAQ
Questions About This Service
Do not see your question here? Call us — we would rather answer it now than after you have booked.
How long will I be without a kitchen?
Plan on two to four weeks without a working sink and range. We can set up a temporary prep station and keep the fridge live.
Do you handle permits?
Yes, when the scope requires it — moving plumbing, electrical or walls. We pull and coordinate inspections.
Can you just paint my existing cabinets?
Absolutely, and it is often the best value. Sprayed cabinet refinishing gives a factory-smooth finish for a fraction of replacement cost.
Also Available
Pairs Well With
Interior Painting
Walls, ceilings, trim and doors finished clean — with real prep, not just a fresh coat over old problems.
Typical timeline
2 – 5 days
Warranty
2 years
PaintingExterior Painting
Siding, trim and decks prepped for Pacific Northwest weather — washed, sealed and coated to actually last.
Typical timeline
4 – 8 days
Best season
Apr – Oct
Tile Installation
Showers, floors, backsplashes and fireplace surrounds — set flat, waterproofed properly, grouted tight.
Typical timeline
3 – 7 days
Waterproofing
Schluter / RedGard







