Painting
Exterior Paint Built For Northwest Weather
Seattle rain finds every unsealed seam. We pressure wash, scrape failing paint, treat bare wood, replace rotted boards and seal every joint before we coat. The result holds its color and keeps water out of your walls.

What's Included
Everything In The Scope
- Pressure washing siding, trim and soffits
- Scraping and sanding loose or failing paint
- Rot assessment and board replacement
- Caulking seams, joints and window perimeters
- Bare-wood and stain-blocking primer
- Two coats of exterior-grade finish
- Garage doors, gutters and railings on request
Starting At
$3.75 / sq ft
A typical 2,000 sq ft home runs $7,000 – $14,000. Rot repair and multi-story access are quoted separately and clearly.
Get My Exact Price(206) 555-0142Materials We Use
- Sherwin-Williams Duration & SuperPaint Exterior
- Benjamin Moore Aura Exterior
- Elastomeric coatings for stucco and masonry
- Solid and semi-transparent deck stains
Typical timeline
4 – 8 days
Best season
Apr – Oct
How It Works
From First Call To Final Walkthrough
The same four steps on every job of this type, so you always know what happens next.
Inspection & quote
We walk the full exterior, flag rot and failing caulk, and price the repairs openly rather than hiding them in change orders.
Wash & repair
Pressure wash, let it dry properly, then scrape, sand and replace damaged wood.
Seal & prime
Every seam caulked, all bare surfaces primed — this is what makes the coating last.
Coat & inspect
Two full coats, then we walk the property with you before the ladders come down.
Free Estimate
Tell Us About
Your Project
Send the details and we will come out, measure, and put real numbers on paper. Most estimates land in your inbox within 48 hours of the visit.
- Free on-site visit and written estimate
- Itemized pricing — you see every line
- Licensed, bonded and insured in Washington
- Two-year workmanship warranty
Exterior Painting FAQ
Questions About This Service
Do not see your question here? Call us — we would rather answer it now than after you have booked.
What if it rains mid-project?
We plan around the forecast and never coat a wet surface. Work pauses, everything stays protected, and we resume as soon as conditions allow.
Can you paint in winter?
Only when temperatures hold above the paint's minimum for several days. Otherwise we book you for spring and tell you honestly.
Do you handle HOA color approvals?
Yes. We can prepare the color submittal and sample boards your HOA needs.
Also Available
Pairs Well With
Interior Painting
Walls, ceilings, trim and doors finished clean — with real prep, not just a fresh coat over old problems.
Typical timeline
2 – 5 days
Warranty
2 years
Tile Installation
Showers, floors, backsplashes and fireplace surrounds — set flat, waterproofed properly, grouted tight.
Typical timeline
3 – 7 days
Waterproofing
Schluter / RedGard
Flooring & Laminate
Luxury vinyl plank, laminate and engineered hardwood installed flat, quiet and square to the room.
Typical timeline
2 – 4 days
Covers
LVP · Laminate · Engineered

