Flooring
Floors That Feel Solid Underfoot
Bouncy, clicking, gapping floors are almost always a subfloor problem. We check flatness, fix the high and low spots, and acclimate material before installation. Then we lay it square to the room with proper expansion gaps, so it stays tight through Seattle's wet and dry seasons.
What's Included
Everything In The Scope
- Removal and disposal of old flooring
- Subfloor flatness check and leveling compound
- Moisture barriers and acoustic underlayment
- Click-lock and glue-down installation
- Stair treads, risers and nosing
- Transitions, reducers and thresholds
- Baseboard or quarter-round reinstall
Starting At
$3.50 / sq ft
Installation only. Material typically adds $2 – $7 per sq ft. Subfloor leveling and stairs are quoted separately.
Get My Exact Price(206) 555-0142Materials We Use
- COREtec, Shaw and Mohawk luxury vinyl plank
- Pergo and Quick-Step laminate
- Engineered oak, walnut and hickory
- Waterproof cores rated for kitchens and baths
Typical timeline
2 – 4 days
Covers
LVP · Laminate · Engineered
How It Works
From First Call To Final Walkthrough
The same four steps on every job of this type, so you always know what happens next.
Measure & estimate
We measure each room, add proper waste factor and give you a square-foot price with nothing hidden.
Prep the subfloor
Old flooring out, subfloor screwed down, leveled and cleaned — the step most crews skip.
Acclimate & install
Material sits in your home before install, then goes down square with correct expansion gaps.
Trim & finish
Transitions, baseboards and quarter-round installed and caulked for a built-in look.
Free Estimate
Tell Us About
Your Project
Send the details and we will come out, measure, and put real numbers on paper. Most estimates land in your inbox within 48 hours of the visit.
- Free on-site visit and written estimate
- Itemized pricing — you see every line
- Licensed, bonded and insured in Washington
- Two-year workmanship warranty
Flooring & Laminate FAQ
Questions About This Service
Do not see your question here? Call us — we would rather answer it now than after you have booked.
Can vinyl plank go over concrete?
Yes, with a moisture test and the right underlayment. Basements and slabs are routine for us.
Do I have to remove my baseboards?
Not always — we can undercut and use quarter-round — but pulling and reinstalling baseboards gives the cleanest result.
Will it work with radiant heat?
Many LVP and engineered products are rated for it. We will confirm the specific product before ordering.
Also Available
Pairs Well With
Interior Painting
Walls, ceilings, trim and doors finished clean — with real prep, not just a fresh coat over old problems.
Typical timeline
2 – 5 days
Warranty
2 years
PaintingExterior Painting
Siding, trim and decks prepped for Pacific Northwest weather — washed, sealed and coated to actually last.
Typical timeline
4 – 8 days
Best season
Apr – Oct
Tile Installation
Showers, floors, backsplashes and fireplace surrounds — set flat, waterproofed properly, grouted tight.
Typical timeline
3 – 7 days
Waterproofing
Schluter / RedGard